Work has continued today to get the steel carried into the mine in place (thanks again to the Go Below staff for the work).

However we could do with some help on Saturday morning (10:30am at the Cwm car park) shifting more stuff into he mine (including a second boat).

Please get in touch if you’re able to help.

Also during the mine inspection week, on Thursday the 30th of March, the gate locks will be replaced with new, and the code changed. Contact whoever you’re working for to get the code.

Gethin

0 thoughts on “Rhiwbach Update (and gate code change)

  • March 22, 2017 at 10:06 pm
    Permalink

    Hi Gethin. Replaced gate locks on bottom and airshaft last weekend after they were found forced open, Set to current code but can be changed if you want.

    Reply
    • March 22, 2017 at 10:29 pm
      Permalink

      Clocked that today, cheers Andy. I’ll drop your lock off at the GB office when we put the new one on.