A few weeks (maybe months!!) ago we had reports that the bridge in Bwlch y Plwm (top of the stope) was dead…
Good news it its now been fixed! The new bridge has yet to be secured to the floor so please be careful if you’re using it (the exit at that level was flooded when we looked at it last week (19th Oct, 2022). We’ll look to bolt/tie it down soon. There’s also no mesh on the top so it may become slippery over time; we’ll need to monitor this and sort it out if it’s problematic. Please do let us know!